- The installation and maintenance of hoarding, dust protection and construction signage around each phase of the work as described in Section 01 56 00 - Protection of Work and Property.
- Wholesale removal, repair, and reinstatement of all finials existing on site and currently in storage. Repair strategy and extend of repairs as noted in the drawings and as directed by the consultant.
- Localized repairs and resetting of deteriorated and/or shifted granite stones at the ground level as directed by the consultant.
- Repair all areas damaged by construction activity; specifically, the Contractor shall repair all damage resulting from the Construction to the satisfaction of the Consultant including repainting of surfaces in accordance with these Specifications which have been damaged.
- Final cleaning of structure, fixtures, piping, etc., and the disposal all waste products and/ or debris generated by the construction activity as well as any material present in the work area prior to the commencement of the Work. The areas requiring cleaning shall consist of all areas affected by the Work.